Sans titre (Site Web)

How much does an overhead crane cost?

How much does an overhead crane cost?[2025]

If you are on this page, it means that you have an overhead crane project, or because you'd like to estimate the cost of such a project. So, how much does an overhead crane cost?

On this page you'll find everything you need to know about
your overhead crane project. Here's what you'll find:

 

In the tables below, you'll find not only the price of the project, but also the costs of maintenance and training. This will help you plan your budget for the short, medium and long term.

  •  

What elements make up the price of your overhead crane project?

An overhead crane project usually involves lifting equipment installed on a structure. But it also requires delivery prior to installation. What's more, these devices require maintenance, and users need to be trained to operate them. The following elements will therefore all be covered.

Please keep in mind about the prices on this page

Due to the complexity of the machines and the many products and solutions available, the configuration possibilities are almost infinite. For this reason, the prices given here are indicative only, and may highly vary depending on the specific features of your project. The following points apply to all price tables:

  • Capacities shown in "t" are metric tons.
  • Prices are in Canadian dollars and are approximate.
  • The equipment considered is basic (without additional options).
  • Transport and installation prices are for Montreal, Quebec City and surrounding areas.
  • Items shown are for the most common projects on the market. For more information or specific prices, please contact us using the form below.
Vector (11)
Establishes and revises the plant's production schedule, taking into account production priorities and constraints.
Vector (11)
Establishes and revises the plant's production schedule, taking into account production priorities and constraints.

Do you want your work to be recognized for its true worth? Do you like a challenge? Would you like to be part of a winning team and an integral member of our trilogy (Canstahl, Groupe Industriel Premium and Structures Industrielles Premium)? Groupe Industriel Premium, Terrebonne branch, offers you a position as Production Planner - Maintenance that will meet your career objectives.

gg_check-o
Terrebonne, Quebec
gg_check-o
Terrebonne, Quebec
gg_check-o
Terrebonne, Quebec
gg_check-o
Terrebonne, Quebec

Quebec and Terrebonne

Toll-free: 1 888-650-0588

Quebec and Terrebonne

Toll-free: 1 888-650-0588

Quebec and Terrebonne

Toll-free: 1 888-650-0588

... choose an environment based on mutual support, respect and authenticity. Engineers, technicians, welders and project managers are all part of our family.

ICONS
Management's transparency and willingness to listen;
ICONS
Management's transparency and willingness to listen;
ICONS
Management's transparency and willingness to listen;

Equipment prices

  • Overhead crane
  • Other equipment
  • Structures

Overhead crane

Type of equipment
Rated
capacity
Span
Lifting height
Price
Product
Delivery
Installation
image 19
Top running single girder overhead crane
3 t to 5 t
50 ft.
20 ft.
10 t to 15 t
50 ft.
20 ft.
30 000$
to 45 000$
1 000$
to 2 000$
3 000$
to 5 000$
55 000$
to 70 000$
1 000$
to 2 000$
3 000$
to 5 000$
image_19-removebg-preview
Top running double girder overhead crane
5 t to 10 t
50 ft.
20 ft.
15 t to 25 t
50 ft.
20 ft.
40 000$
to 65 000$
1 500$
to 3 000$
4 000$
to 7 000$
75 000$
to 105 000$
1 500$
to 3 000$
4 000$
to 7 000$

Other types of equipment

Type of equipment
Capacity
Span
Lifting height
Price
Product
Delivery
Installation
Semi-portal crane-1
Semi-Gantry Crane
5 t
40 ft and -
16 ft
30 000$
to 45 000$
1 000$
to 2 000$
3 000$
to 5 000$
55 000$
to 70 000$
1 000$
to 2 000$
3 000$
to 5 000$
Grue-portique-1-300x186
Gantry crane
5 t
40 ft and -
16 ft
40 000$
to 65 000$
1 500$
to 3 000$
4 000$
to 7 000$
75 000$
to 105 000$
1 500$
to 3 000$
4 000$
to 7 000$
Imge-monorail-autoportant-2-colonnes-e1729182239441-300x270
Monorail
2 t
20 ft.
14 ft
20 000$
1 000$
to 2 000$
4 000 $
to 6 000 $
Stem
Jib crane
250 kg
to 2,000 kg
30 ft and -
14 ft
20 000$
to 40 000$
1 000$
to 2 000$
4 000$
to 8 000$
Ergonomic bridge
Ergonomic crane
250 kg
to 2,000 kg
30 ft and -
14 ft
20,000$ 40,000$
1 000$
to 2 000$
4 000 $
to 8 000 $

Structure price

The structure is the part that supports the lifting equipment. It is often included by the contractor in new building projects. But if this is not the case and you need a structure, Premium can provide it. It must therefore be added to the project price. Depending on the type of project, the structure may be laid on a concrete slab or include foundations. Sometimes, only the rails are required. If your project needs to include a structure or rails, here are the prices of the various options to be added to the price of the equipment.

Structures and components (for a 100' length)

Types of structures and components
Features
Price
Product
Delivery
Installation
Self-supporting structure
Self-supporting crane structure
  • Overhead crane
  • 5 t or less
  • Indoor
  • On concrete slab
40 000$
to 60 000$
1 000$
to 2 000$
5 000$
to 8 000$
Rail mounting
Rails with "J" fixing
  • Top running overhead crane
  • New building without rails
  • 5t or less
  • Interior
7 000$
to 9 000$
included with
equipment
1 500$
to 3 000$
rail without stop
Rails laid on concrete slab
  • Gantry or semi-gantry crane
  • 5 t or less
  • Indoor
  • On concrete slab
10 000$
to 15 000$
included with
equipment
2 000$
to 5 000$

Maintenance and training costs

When buying an overhead crane, we often think that the investment is limited to the prices above. But lifting equipment needs to be maintained throughout its lifetime. So you need to factor this cost into your long-term budget.

What's more, if you're just starting out or hiring a new operator, you'll need to plan for training.

The prices shown below are the approximate basic amounts you'll need to budget for. Inspection and maintenance costs are annual costs.

Inspection périodique annuelle Inspection complète d’un pont roulant (requise au moins 1x/an)
Service price
300$ to 600$
Transport prices
135/hour
Prix des 5 pièces de rechange 
pour votre stock Linguets du crochet / Télécommande supplémentaire / Câble de levage / Frein de charge / Contacteurs et autres pièces électriques
Service price
200$ to
3000 and more
Transport prices
Varies by carrier
Appel de service Appel d’urgence ou réparation
Service price
135/hour
Transport prices
135/hour
Formation d’opérateur sur place par un professionnel requise pour tous les opérateurs
Service price
500$ to 1 500$
Transport prices
Varies according to trainer

Get a customized
quotation

Our advisors are there to support you
every step of the way!

Vector (38)

Why overhead crane prices vary

As you can see, the prices above refer to specific examples and can vary widely. So, when considering your future overhead crane purchase, what are the factors that can reduce or increase your bill? Why do these factors have an impact, and to what extent? Let's find out.

01.
The rated capacity
Vector (28)

What is it?

The weight of the maximum load to be lifted.

Vector (29)

Why?

It's imperative to determine the capacity not only of the overhead crane, but also of the structure on which it travels. The more weight the crane has to lift, the more expensive the whole equipment, including the structure, will be. Its rated capacity is based on the maximum load to be lifted (10% margin of maneuver recommended).

Vector (30)

The impact

 Important to major. Here, although all overhead crane components are designed to suit the capacity to be lifted, it's the combination of the maximum load and the class of use that will determine the price. What's more, the rated capacity can influence the configuration of the equipment, resulting in a significant increase in costs.

02.
The overhead crane span
Vector (28)

What is it?

This is the length of the overhead crane, or more precisely, the distance between the two rails (from the center of the rail).

Vector (29)

Why? 

The longer your overhead crane, the more material it requires to build it. Length can also determine whether girders or box girders will be used.

Vector (30)

The impact

Major. The material is heavier, which has an impact on the price of steel. Production time is longer, etc. The weight of the equipment can also have an impact on the design of the track supporting it.

03.
The speeds
Vector (28)

What is it?

The speed at which equipment moves, whether it's an overhead crane (translation), a cart (steering) or a hoist (lifting). These will vary according to the application. For example, the regular loading of steel structures requires a speed that is not generally necessary for machine maintenance.

Vector (29)

Why?

Higher lifting speeds require higher motor power. A larger motor consumes more electricity, which has an impact on all electrical components. Some precision or heavy-duty applications may also require the addition of a variable speed drive, which increases the price.

Vector (30)

The impact

Medium to high, mainly if you choose higher lifting speeds or add programmable variable speed drives.

04.
The configuration
Vector (28)

What is it?

Your overhead crane can be either top running or under running and can be single- or double-girder.

Vector (29)

Why?

The reasons are similar to the overhead crane's span: more or less expensive material will be used. But the choice is not always possible. It may depend on the configuration of the building, the lifting height required for the application, whether you need a compact unit or a maintenance bridge, for example.

Vector (30)

The impact

Major. See Overhead crane span

05.
The application
Vector (28)

What is it?

What you will be doing with your overhead crane, what you need to lift. For example, an overhead crane can be used for equipment maintenance, an application quite different from feeding a production machine. In concrete terms, your advisor is looking to establish whether the hoist will be used a lot or a little.

Vector (29)

Why?

The application will largely determine the class of use, which in turn will affect component selection. Our blog post on classification explains that " 2 pieces of equipment with the same rated capacity can vary widely in terms of investment." Both mechanical and electrical parts can differ dramatically, influencing the price of the overhead crane.

Vector (30)

The impact

Significant. That said, it all depends on your point of view. According to the cost amortization method, it's also important to consider long-term maintenance costs, such as inspection by a qualified person, which must be carried out at least once a year. (Application and duty cycle will determine the frequency of inspection required under CSA B167). When you choose the right equipment from the outset, it may be more expensive to buy, but maintenance costs are much lower throughout its service life. On the other hand, it can happen that the specifications requested in a quotation are overestimated in relation to actual requirements. By carefully analyzing your needs, your advisor may be able to recommend a more economical overhead crane.

06.
The environment
Vector (28)

What is it?

The type of environment in which your equipment operates. Is it an outdoor overhead crane subject to harsh climates, such as cold, heat, humidity or dust? Are there corrosive products in the air? Etc.

Vector (29)

Why?

To avoid premature wear, the machine must be protected from external elements that could affect its service life. In an environment where there is a risk of explosion, safety must also be ensured by using an explosion-proof overhead crane.

Vector (30)

The impact

Medium to high. It all depends on the overhead crane's operating conditions and what needs to be protected from the environment.

07.
The lifting accessories
Vector (28)

What is it?

These are the accessories below the hook used for your application. They can be spreader bars, grapples, suction pads or magnets.

Vector (29)

Why?

Some accessories need to be powered by an electrical or pneumatic source, which implies modifications to the control panel or command system. The weight of the lifting accessory may also affect the overhead crane's class of use, rated capacity or available lifting height.

Vector (30)

The impact

Medium. This depends largely on the type of accessory, whether standard or custom-made, electric or manual, as well as its dimensions and weight.

Tips for saving money on your overhead crane project

image (46) (1)

Who doesn't want to save money! Here are a few more points to consider when selecting the best supplier at the right price for your overhead crane:

Vector (11)
Compare the features of your equipment, such as span, configuration and speeds.
Vector (11)
What's included in the proposal?
  • Transporting the crane from the manufacturer to the site?
  • Installation, commissioning and load testing?
  • Rental of equipment for installation?
  • Rental of weights for load tests?
Vector (11)
Which manufacturer should I turn to for important components such as motors, hoists, end carriages, etc.?
Vector (11)
Is it a recognized manufacturer?

In conclusion, how much does an overhead crane cost? The price of an overhead crane can vary considerably, depending on a number of factors. It's also important to take into account the maintenance of your overhead crane, as well as operator training - essential elements to be integrated into a long-term vision. By evaluating all these aspects, you'll be able to make an informed choice: an overhead crane that offers excellent value for money.

Discover our information center to learn all about the overhead crane acquisition process! Ready to go further?
Fill out our form below to get a personalized quote. Our advisors are there to support you every step of the way!

Table 1- Row 2
Outdoor overhead crane

845 000$*

Self-supporting structure
on concrete slab

36 000$*

Overhead crane
on wooden structure

65 000$*

Crane span
100 ft.
46 ft
68 ft
Configuration
Double box girder with walkway and operator's cabin
Top running single girder
Single box girder
The application
Steel storage
Granite handling
Machinery manufacturing
Capacity
40,000 lb
3,200 kg
5,000 kg
The environment
Exterior
Heated building
Heated building
Speeds
Variable on 3 motions
2 speeds on the 3 motions
2 speeds on the 3 motions
Required structure
Structure built by Premium Industrial Structures
Supply of a self-supporting structure on concrete slab, $34,000
Supply of rails only
Lifting accessories
No
No
No
*Prices shown here are for guidance only and may vary greatly depending on the features detailed on this page. Unless otherwise indicated, these prices do not include structure, installation, transport or equipment rental. Last update: 2024.

Premium Industrial Group manufactures lifting equipment of all kinds, and offers proposals that include transport, installation and rental of all equipment required for safe, standard-compliant commissioning. We have 2 service outlets covering the whole province of Quebec and beyond, with nearly 50 trucks on the road. We mainly supply Stahl brand products, but have access to a wide range of other products. Our Terrebonne warehouse holds one of the largest inventories of lifting equipment spare parts in Canada.

  •  

Frequently asked questions

01.
When is it best to install an overhead crane in a new building?
On most construction sites, it is recommended to proceed with the installation of the overhead crane once the building is enclosed, the floor is completed, and electricity is available. This allows the installation to be done in a single mobilization, which is more efficient and reduces costs. However, it is necessary to ensure that a clear area on the floor is available to allow for the safe maneuvering of the overhead crane during installation.
02.
Do you need an RBQ license to install an overhead crane in Quebec?
Generally, an RBQ license is not required to install an overhead crane in Quebec, as it is considered production machinery rather than a construction project. However, if the installation involves structural modifications, such as welding or reinforcing the building structure, an RBQ license may be required. For more details, you can read our full article here: Do you need an RBQ license to install an overhead crane in Quebec?
03.
Can the lifting capacity of an existing overhead crane be increased?

Yes, it’s sometimes possible, but it’s not guaranteed.

Increasing the capacity of an overhead crane involves more than just replacing the hoist. The entire system must be evaluated to ensure that every component can handle the increased load. Here are the main elements to check:

  • Is the main girder designed for the intended load?
  • Are the end trucks (wheels and gear motors) compatible with a higher capacity?
  • Can the runway, rails, and supporting structure withstand the additional stress?

In some cases, a well-planned modification can eliminate the need to purchase a new crane. In others, the costs or risks associated with the upgrade may be too high. An inspection can sometimes help determine whether an upgrade is feasible or if replacement is the better option.

Our recommendation: Before making any decisions, have your system (crane and runway) evaluated by a qualified engineer.

01

Their ability to listen to our specific needs has been a major strength. They have always responded quickly and efficiently, especially in emergency situations, which has greatly contributed to the continuity and success of our operations. I highly recommend Groupe Industriel Premium to any company looking for a reliable, structured, and responsive partner. Their professionalism and commitment to quality and safety make them a model in the industry.

Jean-Denis Perron
Groupe Picard